Related Topics

Consent Calendar
15 September 2011

CFA Number: CFA 15/SEP/11–a
Owner(s): D.C. Courts – H. Carl Moultrie I Courthouse
Address: 500 Indiana Avenue, NW –
Description: Expand northeast egress doorway – Concept / Final

RECOMMENDATION: No objection to the final design for the proposed building and landscape alterations to relocate and enlarge the northeast egress doorway and to enlarge its exterior egress pathway from the H. Carl Moultrie I Courthouse, as shown in materials received and dated 26 August 2011.

grey divider line

CFA Number: CFA 15/SEP/11–b
Owner(s): U.S. Department of Defense – Pentagon
Address: Arlington, Virginia –
Description: Replacement fence and security barrier at Heating Plant compound – Concept / Final

RECOMMENDATION: No objection to the replacement fence and security barrier around the Pentagon Heating Plant compound, as shown in materials received and dated 2 September 2011. Design details of new fence and security barrier conform to previously approved installations at the Pentagon complex.

grey divider line

CFA Number: CFA 15/SEP/11–c
Owner(s): U.S. General Services Administration – Central Heating and Refrigeration Plant
Address: 12th and C Streets, SW –
Description: Temporary boilers and exhaust stacks – Final

RECOMMENDATION: No objection to the temporary installation of an equipment enclosure (prefabricated metal shed–type structure) around the previously approved temporary emergency boilers (see previous submission), as shown in materials received and dated 2 September 2011. (Previous: CFA 21/JUL/11–k)

grey divider line

CFA Number: CFA 15/SEP/11–d
Owner(s): U.S. Department of Agriculture – U.S. National Arboretum
Address: Eastside Interceptor project – Hickey Run Creek New York Avenue and Bladensburg Road, NE
Description: Modification of safety railing – Final

RECOMMENDATION: No objection to the proposed substitution of a decorative metal railing, as shown in materials received and dated 12 August 2011, to replace the previously approved pipe–rail safety railing (see case CFA 18/OCT/07–b). Design of the decorative metal railing is similar in detailing to that of the approved Arboretum perimeter fence.

grey divider line

CFA Number: CFA 15/SEP/11–e
Owner(s): Washington Metropolitan Area Transit Authority – WMATA headquarters building
Address: 600 5th Street, NW –
Description: Replacement areaway cover – Final

RECOMMENDATION: No objection to the final design for a replacement cover for the areaway at the front of the WMATA headquarters building, as shown in materials received and dated 19 August 2011. (Previous: CFA 21/JUL/11–l)

grey divider line

CFA Number: CFA 15/SEP/11–f
Owner(s): U.S. Department of State – Israel Embassy
Address: 3514 International Court, NW –
Description: Addition to the existing fence – Final

RECOMMENDATION: No objection to the proposed addition to the top of the existing fence on the north and east sides of the Israel Embassy compound, as shown in materials received and dated 1 September 2011.

grey divider line

CFA Number: CFA 15/SEP/11–g
Owner(s): U.S. Department of the Army – Fort McNair
Address: 4th and P streets, SW –
Description: Back–up electrical generation equipment – Final

RECOMMENDATION: No objection to the final plans for the installation of 5 new electric generators on various sites throughout Fort McNair in Washington, DC, as shown in materials received and dated 4 August 2011. It is understood that the installation of screen walls around the new equipment will be submitted as a separate project in FY 2012.

grey divider line

CFA Number: CFA 15/SEP/11–h
Owner(s): U.S. Department of the Army – Joint Base Fort Myer–Henderson Hall
Address: Arlington, Virginia –
Description: Back–up electrical generation equipment – Final

RECOMMENDATION: No objection to the final plans for the installation of 11 new and 4 replacement electrical generators on various sites throughout Joint Base Fort Myer– Henderson Hall, Arlington, Virginia, as shown in materials received and dated 4 August 2011. It is understood that the installation of screen walls around the new equipment will be submitted as a separate project in FY 2012. Refer to Virginia State Historic Preservation Office.

grey divider line

CFA Number: CFA 15/SEP/11–i
Owner(s): U.S. Department of the Army – Fort McNair
Address: Marshall Hall 4th and P Streets, SW –
Description: Landscaping for Marshall Hall South Plaza – Concept / Final

RECOMMENDATION: No objection to the final plans for the installation a landscaped plaza as an outdoor public area at the south end of Marshall Hall on Fort McNair in Washington, DC, as shown in materials received and dated 2 September 2011.

grey divider line

CFA Number: CFA 15/SEP/11–j
Owner(s): U.S. Department of the Army – Rader Health and Dental Clinic
Address: Building 525 Joint Base Fort Myer–Henderson Hall – 401 Carpenter Road, Arlington, Virginia
Description: Boiler enclosure – Final

RECOMMENDATION: No objection to the final plans for the installation of an enclosure for the existing boiler equipment at the Rader Health and Dental Clinic (Building 525) at Joint Base Fort Myer–Henderson Hall, Arlington, Virginia, as shown in materials received and dated 2 September 2011.

grey divider line

CFA Number: CFA 15/SEP/11–k
Owner(s): Pan American Health Organization – Office building
Address: 525 23rd Street, NW –
Description: Exterior door and glazing replacement – Final

RECOMMENDATION: No objection to the final plans for the replacement doors and glazing of the first floor of the rotunda, as shown in materials received and dated 8 August 2011.

grey divider line

CFA Number: CFA 15/SEP/11–l
Owner(s): Key Elementary School –
Address: 5001 Dana Place, NW –
Description: Install two temporary classroom trailer units on existing parking lot – Final

RECOMMENDATION: No objection to the installation of two temporary modular classroom units (trailers) on the existing parking lot of Key Elementary School, as shown in materials received and dated 10 August 2011 and 30 August 2011.

grey divider line

CFA Number: CFA 15/SEP/11–m
Owner(s): D.C. Office of Public Education Facilities Modernization – Meyer Elementary School
Address: 2501 11th Street, NW –
Description: Install temporary classroom trailer units on existing school yard – Final

RECOMMENDATION: No objection to the final plans for the temporary installation of modular classroom units (trailers), covered walkways, stairs, ramps, and utilities as shown in materials received and dated 12 August 2011.

grey divider line

CFA Number: CFA 15/SEP/11–n
Owner(s): D.C. Office of Public Education Facilities Modernization – Scott Montgomery School
Address: 421 P Street, NW –
Description: Building renovation, modifications, addition, and site improvements – Concept

RECOMMENDATION: No objection to the concept design for a one–story classroom addition above the existing cafeteria wing, as shown in materials received and dated 26 August 2011. Design conforms to previously approved submission for the building renovation and other exterior modifications. (Previous: CFA 21/APR/11–j)

grey divider line

CFA Number: CFA 15/SEP/11–o
Owner(s): Forest City Washington – The Yards, Building 160
Address: 301 Tingey Street, SE –
Description: Windows, doors and signs for restaurant tenant – Final

RECOMMENDATION: No objection to the proposed final plans for building alterations to windows and doors for restaurant tenant including new signs, as shown in materials received and dated 25 August 2011.

grey divider line

CFA Number: CFA 15/SEP/11–p
Owner(s): U.S. Department of the Army –
Address: Building 400, US Army Band Building – Joint Base Fort Myer–Henderson Hall, Arlington, Virginia
Description: Loading dock expansion – Final

RECOMMENDATION: No objection to the final plans for the expansion of the loading dock for the US Army Band Building (Building #400), Joint Base Fort Myer–Henderson Hall, Arlington, Virginia, as shown in materials received and dated 2 September 2011.

grey divider line

CFA Number: CFA 15/SEP/11–q
Owner(s): National Park Service – American Veterans Disabled for Life Memorial
Address: Washington Avenue, 2nd and C streets, SW –
Description: New memorial – Final

RECOMMENDATION: Final designs and selections for the artwork and inscriptions approved by delegation. See letter dated 5 August 2011. Final designs and selections conform to previously approved submission. (Previous: CFA 17/MAR/11–m) ACTIONS PREVIOUSLY DELEGATED TO STAFF

grey divider line

CFA Number: CFA 15/SEP/11–r
Owner(s): D.C. Office of Public Education Facilities Modernization – Public park and playground
Address: 7th and N Streets, NW –
Description: New landscape and park rehabilitation – Final

RECOMMENDATION: Final design approved by delegation. See letter dated 1 September 2011. Final design conforms to previously approved submission. Refer to DC Historic Preservation Office. (Previous: CFA 19/NOV/09–q) ACTIONS PREVIOUSLY DELEGATED TO STAFF

grey divider line

Last Modified: September 27, 2011