Related Topics

Consent Calendar
15 November 2012

CFA Number: CFA 15/NOV/12–a
Owner(s): U.S. General Services Administration –
Address: Potomac Annex – Building 1 23rd and E Streets, NW
Description: Building rehabilitation, new access ramp and mechanical equipment – Final

RECOMMENDATION: No objection to the final design for the rehabilitation of Building 1 at the Potomac Annex, which includes the installation of a new access ramp and new mechanical equipment, and the removal of existing window air conditioning units and obsolete exterior HVAC equipment, as shown in materials received and dated 1 November 2012.

grey divider line

CFA Number: CFA 15/NOV/12–b
Owner(s): U.S. General Services Administration – St. Elizabeths West Campus – four locations
Address: 2700 Martin Luther King Jr. Avenue, SE –
Description: Installation of communication antennas, Phase I – Final

RECOMMENDATION: No objection to the final designs for the installation of various communication antennas at four locations on the St. Elizabeths West Campus for the Department of Homeland Security, as shown in materials received and dated 1 November 2012.

grey divider line

CFA Number: CFA 15/NOV/12–c
Owner(s): U.S. General Services Administration – Department of Homeland Security
Address: Nebraska Avenue Complex – 3801 Nebraska Avenue, NW
Description: Guard booth and alterations to pedestrian turnstiles at Buildings 7 and 88 – Final

RECOMMENDATION: No objection to the final designs for a guard booth and alterations to the existing pedestrian turnstiles at Building 7 and for alterations to the existing pedestrian turnstiles at Building 88, as shown in materials received and dated 1 November 2012.

grey divider line

CFA Number: CFA 15/NOV/12–d
Owner(s): U.S. Department of the Army – Old Post Chapel
Address: Joint Base Fort Myer–Henderson Hall – Arlington, Virginia
Description: Building renovation and exterior access ramps – Final

RECOMMENDATION: No objection to the final design for the for the building renovation and addition of an exterior access ramp to the Old Post Chapel, Joint Base Fort Myer–Henderson Hall, Arlington, Virginia, as shown in materials received and dated 5 November 2012.

grey divider line

CFA Number: CFA 15/NOV/12–e
Owner(s): D.C. Department of General Services – Police Department facility
Address: (former Washington Times printing facility) – 2850 New York Avenue, NE
Description: Building renovation and alterations – Final

RECOMMENDATION: No objection to the final plans for the proposed renovation of and minor exterior alterations to the former Washington Times printing facility at 2850 New York Avenue, NE, for the D.C. Metropolitan Police Department, as shown in materials received and dated 1 November 2012.

grey divider line

CFA Number: CFA 15/NOV/12–f
Owner(s): D.C. Department of General Services – FEMS Engine Company No. 16 Firehouse
Address: 1018 13th Street, NW –
Description: Building renovation and enlargement of engine bay doors – Final

RECOMMENDATION: No objection to the final plans for the rehabilitation of and alterations to Engine Company No. 16 Firehouse, as shown in materials received and dated 31 October 2012.

grey divider line

CFA Number: CFA 15/NOV/12–g
Owner(s): University of the District of Columbia – Van Ness Campus
Address: 4200 Connecticut Avenue, NW –
Description: Plaza restoration and repaving of B Level Plaza of the Auditorium (Building 46E) – Final

RECOMMENDATION: No objection to the final plans for the restoration and repaving of the "B" Level Plaza of the Auditorium (Building 46E), on the Van Ness Campus of the University of the District of Columbia, as shown in materials received and dated 31 October 2012.

grey divider line

CFA Number: CFA 15/NOV/12–h
Owner(s): D.C. Department of General Services – Maya Angelou Public Charter School
Address: (former Bruce Evans Middle School) – 5600 East Capitol Street, NE
Description: Building renovation, replacement windows, and new parking lot – Final

RECOMMENDATION: No objection to the final design for the building renovation of the former Bruce Evans Middle School for the Maya Angelou Public Charter School, as shown in materials received and dated 7 November 2012. Work includes new building systems and finish upgrades, replacement windows and doors, site improvements, other minor alterations, and a new parking lot. Submission conforms to previously approved concept design. (Previous: CFA 18/OCT/12–g)

grey divider line

Last Modified: November 26, 2012