Recommendation
No objection to concept design for proposed two-story rear addition, roof deck and roof top addition of stair tower as shown in supplemental drawings received 18 November 2014, which indicate trash room within footprint of addition, provided that stair tower is squared off and clad in flat locked-seam metal panels. File new submission at DCRA of working drawings, including dimensioned architectural details, cut-sheets, and material samples, with permit application for review by the Commission.