Recommendation
No objection to final design for modifications to existing rooftop cellular antenna array for T-Mobile, per materials received 4 September 2025. Scope of work includes removal of two existing small cell antennas and installation of two new mmWave small cell panel antennas of similar size on existing pole mount; equipment will be painted to match the color of adjacent building surfaces.