Recommendation
No objection to concept design for new window well at front and addition at rear, per supplemental materials received 16 February 2026, PROVIDED the window well is only as wide as the existing window, or minimum size as required by DOB, and Option 2 is used at the rear addition. Meters may be located in window well as long as minimal space is required for installation. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.