CFA 15/JAN/26-a
No objection to the final design for the installation of three new sector antennas and associated infrastructure for FirstNet, per materials received 31 December 2025, which indicate that the penthouse-mounted installation would be screened and painted to match the building facade, and labeled Option #3. (Previous: CFA 16/MAY/24-d)
CFA 15/JAN/26-aa
No objection to the final design to replace the doors and windows at K.C. Lewis Elementary School, located at 300 Bryant Street, NW per materials received on 2 October 2025. This work is being proposed to allow this school building to be used as swing space as other schools are renovated in the city.
CFA 15/JAN/26-b
No objection to the revised concept design of a new commercial vehicle inspection facility and a restroom building on the Pentagon Reservation adjacent to the National 9/11 Pentagon Memorial in Arlington, Virginia. Scope of work includes the replacement of the existing vehicle screening facility with a permanent one that incorporates within the building, a control room, administrative spaces, and a kennel while a canopy will cover the vehicles to be inspected. A stand-alone structure with restrooms for visitors to the National 9/11 Pentagon Memorial is also being proposed. (Previous: CFA 18/JUN/25-3)
CFA 15/JAN/26-bb
No objection to concept design to modernize Euclid Elementary School located at 800 Euclid Street, NW, per materials received 31 December 2025. Scope of work includes renovating the interior, creating an accessible main entrance, providing an outdoor classroom, and improving the loading area, while meeting D.C. government sustainability requirements and protecting historic integrity. Refer to D.C. Historic Preservation Office.
CFA 15/JAN/26-c
No objection to final design for repairs to Crook Walk bridge and drainage channels in Section 37, per materials received 6 November 2025. Scope of work includes rebuilding the culvert walls of the Crook Walk bridge, repairing historic brick-lined drainage channel, and in-kind replacement of existing precast concrete drainage channels.
CFA 15/JAN/26-cc
No objection to concept design to renovate Marvin Gaye Playground at 6201 Nannie Helen Burroughs Avenue, NE, per materials received 31 December 2025. Scope of work includes new playground structures and splash pad features, new seating, trash bins bicycle racks, new pathways, and plantings.
CFA 15/JAN/26-d
No objection to final design for construction of temporary screen wall and shed, per materials received 6 November 2025, which indicate that the installation will be removed no more than five years after its completion; a permanent storage shed will be constructed near the existing support building as part of the ongoing ANC Southern Expansion Project.
CFA 15/JAN/26-dd
No objection to concept design to renovate a triangle park located at the intersection of Park Road and Mount Pleasant Street, NW, per materials received 31 December, 2025. Scope of work includes repairing a brick pathway, new seating, trash bins, drinking fountain, bicycle racks, and plantings.
CFA 15/JAN/26-e
No objection to the final design to install three small communication antennas on the roof of Roosevelt Hall at Fort McNair, 300, D Street, SW per materials received 2 October 2025.
CFA 15/JAN/26-ee
No objection to the installation of a retail sign for Luma Wellness Studio located at 149 N Street, SE per the materials received 2 October 2025.
CFA 15/JAN/26-f
No objection to the final design to refurbish existing signage on the grounds of the National Museum of Asian Art, formerly the Sackler and Freer Museums, on the National Mall, per materials received 2 October 2025.
CFA 15/JAN/26-g
No objection to the final design for new boiler plant equipment at the William J. Clinton Building, per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-h
No objection to the final design for new boiler plant equipment at the Civil Service Commission Building, 1724 F Street, NW per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-i
No objection to the final design for new boiler plant equipment at the New Executive Office Building, 725 17th Street, NW per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-j
No objection to the final design for new boiler plant equipment at the U.S. Court of Appeals for the Armed Forces building, 450 E Street, NW per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-k
No objection to the final design for new boiler plant equipment at the E. Barrett Prettyman Courthouse and Bryant Annex building, 333 Constitution Avenue, NW per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-l
No objection to the final design for new boiler plant equipment at the Eisenhower Executive Office building, 1650 17th Street, NW per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-m
No objection to the final design for new boiler plant equipment at the Robert F. Kennedy building, 950 Pennsylvania Avenue, NW per materials received 2 October 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-n
No objection to the final design to install wireless communication antenna on the roof of the E. Barrett Prettyman Courthouse and Bryant Annex at 333 Constitution Avenue, NW per materials received 2 October 2025.
CFA 15/JAN/26-o
No objection to the final design for new boiler plant equipment at the Howard T. Markey National Courts building, 717 Madison Place, NW per materials received 2 November 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-p
No objection to the final design for new boiler plant equipment at the U.S. Tax Court building, 400 2nd Street, NW per materials received 6 November 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-q
No objection to the final design to install wireless communication antenna on the roof of the Veterans Administration Headquarters building at 810 Vermont Avenue, NW per materials received 4 November 2025.
CFA 15/JAN/26-r
No objection to the final design for temporary decorative banners to be installed on the Stewart Lee Udall Building located at 1849 C Street, NW, per materials received 4 December 2025. These banners will be part of the celebration for America's 250th anniversary.
CFA 15/JAN/26-s
No objection to the final design for temporary decorative banners to be installed on the Lyndon Baines Johnson building located at 400 Maryland Avenue, NW, per materials received 31 December 2025. These banners will be part of the celebration for America's 250th anniversary.
CFA 15/JAN/26-t
No objection to the final design for new boiler plant equipment at the Lyndon Baines Johnson Building located at 400 Maryland Avenue, SW, per materials received 31 December 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-u
No objection to the final design for new boiler plant equipment at the Sidney R. Yates Federal Building located at 201 4th Street, SW per materials received 31 December 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, flues, and several grates. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-v
No objection to the final design for new boiler plant equipment at the Natioanl Building Museum located at 401 F Street, NW, per materials received 31 December 2025. Scope consists of a building-wide energy retrofit including the installation of a natural gas-fired hot water boiler plant, a gas meter, and flues within an existing cooling tower enclosure on the northwest corner of the site. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 15/JAN/26-w
No objection to design development submission for demolition of the existing two-story building and the construction of a new two-story brick recreation center and site improvements, per supplemental materials received 18 September 2025, PROVIDED the entrance canopy dimension is coordinated with the adjacent cast stone elements; the soffit material is copper; landscaping and paving layout and materials are restudied and their extent reduced; bench locations are restudied; additional trees are placed within the parking lot; bollards are restudied to be sufficiently sturdy to protect pedestrians; fencing is vertical wood slats; solar panels do not extend over pool and are arranged in an orthogonal manner with landscaping at their base and supports painted dark green or dark gray; and the material of the mechanical enclosure at the pool is revised to match the adjacent building. File permit submission with detailed and dimensioned drawings for review by the Commission. This recommendation is made by the Old Georgetown Board of the Commission of Fine Arts and will be presented to the Commission for final adoption at its next meeting. Refer to DC Historic Preservation Office.
CFA 15/JAN/26-x
No objection to the final design of a new recreation center building and landscape improvements for the Congress Heights Recreation Center at 611 Alabama Avenue, SE, per materials received 31 December 2025. Final design is responsive to the Commission and consistent with the approved revised concept design. Refer to DC Historic Preservation Office. (Previous: CFA 17/JUL/25-4) Refer to DC Historic Preservation Office.
CFA 15/JAN/26-y
No objection to the revised concept design of a building and landscape improvements for at 1900 Gallaudet Street, NE, per materials received 31 December 2025. Scope of this project will renovated the existing building on site and repurpose it for use as community center with activity rooms, senior lounge, teen lounge, a demonstration kitchen, and support space. Landscape improvements will include an athletic field, community green, playgrounds, renovating existing basketball courts, and a parking lot. Refer to DC Historic Preservation Office.
CFA 15/JAN/26-z
No objection to the final design for the second floor addition to connect two existing floors of this school building, per materials received 6 November 2025.