CFA 19/NOV/26-a
Project approved by delegation. See letter dated 29 October 2026.
CFA 19/NOV/26-b
No objection to revised final design for restoration of historic gatehouse and quarters, per materials received 5 November 2026, which indicate that the previously proposed bioretention areas adjacent to the historic building have been moved to another area of the Navy Yard. Refer to DC Historic Preservation Office.
CFA 19/NOV/26-c
No objection to final design for rehabilitation of existing building for use as museum support facility, per materials received 5 November 2026. Final submission is consistent with previously approved concept design.
CFA 19/NOV/26-d
No objection to final design for rehabilitation of existing building for office use, per materials received 5 November 2026. Exterior scope of work includes infill of one bay and construction of a canopy for the new entrance, and construction of a temporary ramp for building access.
CFA 19/NOV/26-e
No objection to final design for construction of at-grade access point for temporary emergency chilled water access, per materials received 5 November 2026. Scope of work includes 2 at-grade entry hatches and 2 capped pipes. The lawn shall be restored following the conclusion of the project. Refer to DC Historic Preservation Office.
CFA 19/NOV/26-f
No objection to concept design for modifications to south plaza pool and associated lighting and signage replacements to improve visitor safety, per supplemental materials received 10 November 2026. Scope of work at the pool includes a new metal railing for fall protection, a stone material change at the water feature for improved edge detection, and signage. Scope of work for the lighting includes new fixtures to light the Porch Canopy and fixtures under the existing stone bench at the north side of the pool. Temporary planters and stanchions shall be removed when the work is complete.
CFA 19/NOV/26-g
No objection to final design for installation of solar panels and associated equipment, per materials received 5 November 2026. Scope of work includes installation of panels at the reservoir roof and east slope, along with equipment to connect to the existing power grid. The existing site fence shall remain in place. Please coordinate with the National Park Service. Refer to DC Historic Preservation Office.
CFA 19/NOV/26-h
No objection to revised final design for installation of boiler plant and associated equipment, per materials received 5 November 2026, which indicate that gas meter would now be located in the basement and not on the building exterior. This project is one component of a larger initiative, the National Deep Energy Retrofit, which is an energy conservation program for federal buildings.
CFA 19/NOV/26-i
No objection to final design for temporary modifications to existing cellular antenna array for Verizon to accommodate building construction work, per materials received 5 November 2026. Scope of work includes relocation of 6 antennas in the alpha sector to mounts located on the mechanical screen wall above the 2013 infill structure; and relocation of 6 antennas in the gamma sector to mount locations on the west side of the 2013 south mechanical penthouse. The antennas shall be painted or wrapped to match the color of the adjacent surfaces. The construction work is anticipated to last 2 years.
CFA 19/NOV/26-j
No objection to final design for temporary modifications to existing cellular antenna array for T-Mobile to accommodate building construction work, per materials received 5 November 2026. Scope of work includes relocation of 2 antennas in sector one to the existing T-Mobile equipment platform; and relocation of 2 antennas in sector 3 to the 2013 south mechanical penthouse. The antennas shall be painted or wrapped to match the color of the adjacent surfaces. The construction work is anticipated to last 2 years.
CFA 19/NOV/26-k
No objection to final design for installation of three bioretention areas within the green space along the existing athletic fields, per materials received 5 November 2026.