OG 05-100
No objection to issuance of permit for proposed reconstruction / addition of a 12-foot deep two-story porch at rear, partially enclosed at lower level, as shown in supplemental drawings received and dated 1 December 2005. Working drawings conform to approved concept. See previous Recommendation (OG 04-278). Note is made that permit application is pending final zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval. See letter from Mr. Bill Crews, Zoning Administrator.
OG 05-184
OG 05-286
OG 06-019
OG 06-032
OG 06-034
OG 06-035
OG 06-038
OG 06-039
No objection to issuance of permit for proposed alterations to penthouse terrace at Washington Harbour, including removal of brick arches and reconstruction of parapet wall. Working drawings conform to second option discussed during concept review and approval. See previous Recommendation (OG 05-299).
OG 06-040
No objection to issuance of permit for proposed side addition, alterations and rear roof terrace at second floor level. Working drawings conform, with minor revisions, to approved concept. See previous Recommendation (OG 05-211). No objection to the installation of vinyl railing system in this 1958 building due to its location and the limited impact on the historic district. Note is made that permit application is pending final zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.
OG 06-041
OG 06-042
OG 06-043
No objection to issuance of permit for proposed alterations, including addition of third floor behind mansard roof, alterations to front facade for new window openings, new basement entrance at front and alterations to rear facade, as shown in supplemental drawings received and dated 16 December 2005 which indicate removal of chimney and alignment of basement openings with windows above. Working drawings respond to the recommendations given during concept review (OG 05-296). Note is made that permit application is pending final zoning review. Any modifications to the approved design as a result of further review in the permit process must be submitted to the Commission for approval.