Recommendation
No objection to issuance of permit to replace the roof with CertainTeed Pro shingles, replace the aluminum flashing with copper, and replace the skylight, per supplemental materials received 10 June 2025 that included typical detail specifications for the proposed copper drip edge and adjacent connections as was required by the Old Georgetown Board. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.