Recommendation
No objection to concept design for interior renovation to excavate basement and convert a bulkhead on the east elevation to a window well and restore existing windows, per supplemental materials received 21 June 2025, PROVIDED the proposed window well on the west elevation is deleted from the design or if it remains, its location further studied in relation to the existing fenestration. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.