OG 24-355
No objection to concept design for interior renovation to excavate basement and convert a bulkhead on the east elevation to a window well and restore existing windows, per supplemental materials received 21 June 2025, PROVIDED the proposed window well on the west elevation is deleted from the design or if it remains, its location further studied in relation to the existing fenestration. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-133
Returned without action. Permit application for new construction has been inactive for an extended period, and documentation was insufficient for OGB review. File new permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-166
No objection to concept design for replacement of double-hung windows on the south elevation with wood windows, per supplemental materials received 27 June 2025, PROVIDED no loE coatings are used and any storm windows or energy panels be installed on the interior side of the window. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-180
No objection to issuance of permit to demolish existing one-story masonry building and construct a four-story mixed-use building, per supplemental materials received __ July 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-188
Returned without action. Concept application for window replacement was superseded by permit application OG 25-267, HPA 25-319.
OG 25-209
No objection to concept design for replacement and partial restoration of the exterior brownstone stairs on the north and east elevations, per supplemental materials received 2 July 2025, PROVIDED the applicant study retention of the historic railings, using cubic stone for the supporting post, and reusing the existing stone for the vertical wall of coursed stone blocks on the north stair. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-214
No objection to concept design to construct a second story addition on existing masonry garage, per supplemental materials received 11 June 2025. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-215
No objection to concept design to replace gate on the north side of the rear yard with new wood door and to install a green roof on the east wing of the house, per supplemental materials received 20 June 2025, which indicate no changes to the existing rooftop terrace and railing. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-219
No objection to issuance of permit to replace the Lobby Entrance doors and ramp; replace the Entrance Hall doors; replace Exit Gate A; and replace Exit Gate B and ramp on the rooftop of Georgetown University's Car Barn, per supplemental materials received 11 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-229
No objection to the concept design for the Flour Mill office to residential and retail conversion with additions and building and site alterations, per supplemental materials received 23 June 2025, PROVIDED that the proposed screen wall on the 1922 Mill’s penthouse is pewter gray; two punched window openings at each level are created on the west elevation of the 1922 Mill; the applicant works with staff on the design of the proposed painted sign on the west elevation of the 1922 Mill; and the applicant studies a painted sign reading "Pioneer Mills" on the north elevation of the 1847 Mill. File design development submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-232
No objection to issuance of permit for repaving, per supplemental materials received 24 June 2025. Note that pergola and shed were removed from the application and are not part of this approval. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-238
Recommend AGAINST issuance of permit for roof replacement due to insufficient information, as well as an incompatible proposal to replace the existing standing-seam metal roof with asphalt shingles. File new submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-239
No objection to issuance of permit to replace the standing seam and membrane roofs and flashing in kind, per supplemental materials received 18 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-240
No objection to issuance of permit to replace and install wall-mounted antennas to an existing mounting rack on the second story of the east elevation and to replace roof-mounted antennas inside existing shrouds, per supplemental materials received __ July 2025, PROVIDED the western shroud is turned so its length is parallel to the south building wall, the east shroud is extended to meet the roof, and both are painted to match the masonry building, so as to resemble chimneys. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-243
No objection to issuance of permit for replacement of five inappropriate 1/1 vinyl windows on the front elevation with single-glazed, 6/6, true-divided-lite, single-hung wood windows, per supplemental materials received 18 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-244
Returned without action. Revised permit application to change the location of the previously approved pavilion from northeast to southeast of the main house was withdrawn at the written request of the applicant on 10 July 2025, as the Old Georgetown Board found the proposed relocation would have a detrimental impact on the primary elevation of the historic Evermay house.
OG 25-245
No objection to issuance of permit for replacement of existing gutter liner with copper, per materials received 13 June 2025, PROVIDED the existing slate is reinstalled. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-246
No objection to issuance of permit to replace the standing seam and membrane roofs and flashing in kind, per the supplemental materials received 1 July 2025, which include a typical detail specification for the proposed drip edge and replacement roof material, per Old Georgetown Board request. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-248
No objection to issuance of permit to replace roofing and the gutter liner, per the supplemental materials received 8 July 2025, which indicate the replacement gutter liner would be copper, the roof of the rear bump out would be metal, and flashing details are included for the roof, per Old Georgetown Board request. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-249
No objection to issuance of permit for sign reading "J.CREW" installed over the front entrance, per supplemental materials received 9 July 2025, which indicate that rear single-story portion of building will remain unpainted brick, per OGB request. Note that second sign on 31st Street above storefront window was removed from application after OGB did not support it. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-251
Returned without action. Permit application for Mejuri signage was withdrawn by the applicant; scope already received OGB approval in June 2025 (see OG 25-212, HPA 25-252).
OG 25-253
Returned without action. Submission materials and a site visit on 18 June 2025 indicate that the proposed roof replacement would not be visible from a public thoroughfare. Refer to the Historic Preservation Review Board.
OG 25-258
No objection to issuance of permit to install two flagpoles at the Embassy of Romania, per the supplemental materials received 7 July 2025, which indicate both flagpoles would be shorter than the initially proposed; the flagpoles would be installed through the mortar joints and into a structurally sound base behind the bricks; and the cleats would be installed in mortar and not brick, per Old Georgetown Board request. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-259
No objection to issuance of permit to replace the shutters and rear porch columns; alter the fenestration on the rear elevation, and install rooftop condensers on the rear elevation, per the supplemental materials received 8 July 2025, which include cross sections for the proposed replacement fenestration; confirmation the proposed windows and doors conform with the Board's Window Policy and Guidelines; and confirmation the Polystone columns would be hand-painted, per Old Georgetown Board request. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-260
No objection to issuance of permit for replacement of existing wood door at rear elevation with wood door to match existing, per supplemental materials received 20 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-262
No objection to issuance of permit for relocation of garage opening and new garage door, per supplemental materials received 18 June 2025, which indicate the new door would be wood. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-263
No objection to the concept design to construct an accessible entrance, restore windows, and alterations at Georgetown University's New North, per materials received 13 June 2025, PROVIDED the primary pier is a full arch the same height as the proposed railing; the proposed entryway design closely matches the design of the existing window to be removed; more documentation and details are provided for the windows proposed for replacement; the outward-facing surface of the interior storms are painted gray; the ramp has a stone paver surface (Option 2); and the railings are consistent with the other railings on campus. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-264
No objection to issuance of permit to install planting beds with brick border in public space, flanking the front stair on the east elevation, per materials received 13 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-265
No objection to issuance of permit to remove brick infill within the opening and install a single-glazed, wood sash window on the first floor of the west elevation, per the supplemental materials received 5 July 2025, which include a dimensioned drawing of the existing window to serve as the model, per Old Georgetown Board request. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-266
Returned without action. Permit application for awning and signage was withdrawn at the written request of the applicant on 30 June 2025.
OG 25-267
No objection to issuance of permit to replace the third and fourth floor windows on the east and south elevation with full frame, simulated-divided-light, wood replacement windows, per materials received 13 June 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-268
Returned without action. Concept application for exterior stair replacement was superseded by concept application OG 25-209 / HPA 25-249.
OG 25-269
No objection to concept design for new HVAC unit for Yates Field House, per supplemental materials received 23 June 2025, PROVIDED the existing 7-ft-tall fence is replaced with a 10-ft-tall vertical-board fence to screen the equipment. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.