Recommendation
No objection to the concept design to construct an accessible entrance, restore windows, and alterations at Georgetown University's New North, per materials received 13 June 2025, PROVIDED the primary pier is a full arch the same height as the proposed railing; the proposed entryway design closely matches the design of the existing window to be removed; more documentation and details are provided for the windows proposed for replacement; the outward-facing surface of the interior storms are painted gray; the ramp has a stone paver surface (Option 2); and the railings are consistent with the other railings on campus. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.