CFA 18/JAN/18-a
No objection to the final design for the construction of a new elevator and stair addition on Building 58 at Fort McNair, as shown in materials received and dated 18 December 2017. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-b
No objection to the revised concept design for the installation of new rooftop mechanical equipment with an acoustical screen enclosure on the LaSalle-Backus Education Center building, as shown in materials received and dated 4 January 2018. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-c
No objection to the final design for a new building identification sign at one of the revolving doors at the south entrance to the Hirshhorn Museum, as shown in materials received and dated 4 January 2018. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-d
No objection to the final design for the installation of rooftop solar panels on Janney Elementary School, as shown in materials received and dated 3 January 2018. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-e
No objection to the final design for the installation of rooftop solar panels on Plummer Elementary School, as shown in materials received and dated 3 January 2018. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-f
No objection to the final design for the installation of rooftop solar panels on Riggs LaSalle Recreation Center, as shown in materials received and dated 3 January 2018. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-g
No objection to the final design for the installation of rooftop solar panels on the Takoma Education Campus buildings, as shown in materials received and dated 3 January 2018. Refer to DC Historic Preservation Office.
CFA 18/JAN/18-h
No objection to the final design for the installation of rooftop solar panels on the Wheatley Education Campus buildings, as shown in materials received and dated 3 January 2018. Refer to DC Historic Preservation Office.
OG 18-039
No objection to concept design for an addition and site work, as per drawings received 17 November 2017, PROVIDED further development of the landscape plan to maximize planting, provide green buffer at the base of the building, and mitigate extensive hardscape for play area. File new submission of working drawings, including details, dimensions and landscape plan with permit application for review by the Commission.
OG 18-060
No objection to concept design for rehabilitation of Montrose Park tennis courts, which includes removal of second unoriginal tennis court near the ropewalk and reorientation of the first court to the original east-west position, replacement of chain-link fence, installation of additional stone retaining walls and plantings at the R Street tennis courts, and installation of three underground bio-retention facilities, per drawings received 17 November 2017, PROVIDED the historic gas lamps are retained, new chain-link fence is painted a dark color, and only one tree is removed. File permit submission with detailed and dimensioned drawings for review by the Commission.