CFA 15/MAY/25-a
No objection to final design for repairs and replacement to the front stair and landing of Old Stone House, the wood shingle roof on the gardener's shed, and site fencing, per supplemental materials received 25 April 2025, which indicate all replacement materials will match the existing in design and material and the fence will be the same height as existing.
CFA 15/MAY/25-b
No objection to final design for a new memorial commemorating the legation that represented the independent Republic of Texas, per supplemental materials received 7 May 2025; the memorial will be located within an existing raised planter bed along the 600 block of Indiana Avenue, NW. Final design is consistent with previously approved concept and associated recommendations.
CFA 15/MAY/25-c
No objection to final design for two new barracks buildings on Sheridan Avenue at Fort Myer in Arlington, Virginia, per materials received 1 May 2025. Final design is consistent with previously approved concept and associated recommendations.
CFA 15/MAY/25-d
No objection to final design for modifications to 7 existing officers posts facilities to meet current operational requirements, per materials received 3 April 2025. Guard booths incorporate a booth, barriers, and associated security measures. Final design is consistent with previously approved concept. Refer to DC Historic Preservation Office.
CFA 15/MAY/25-e
No objection to final design for modifications to an existing cellular antenna array, per materials received 1 May 2025. Scope of work includes exchanging two existing small-cell antennas with two new mmWave antennas, and replacing one damaged hybrid cable with one new hybrid cable; the total antenna count would be unchanged. The new antennas would be painted to match the building facade.
CFA 15/MAY/25-f
No objection to final design for replacement of existing retractable bollards and temporary wedge barriers with retractable C-shaped arm barriers, per materials received 1 May 2025.
CFA 15/MAY/25-g
No objection to concept design for site alterations to accommodate temporary use during renovation of the Henry J. Daly Headquarters Building, per materials received 1 May 2025, PROVIDED the applicant consult with the Historic Preservation Office and Department of Transportation regarding potential impacts on historic resources and public space. Scope of work includes new brick and metal fence, pedestrian and vehicular access gates, and modifications to existing curb cuts.
CFA 15/MAY/25-h
Project approved by delegation. See letter dated 8 May 2025.
CFA 15/MAY/25-i
Project approved by delegation. See letter dated 8 May 2025.
CFA 15/MAY/25-k
Rue du Mémorial Américain 159
Hombourg, Belgium
Project approved by delegation. See letter dated 8 May 2025.
CFA 15/MAY/25-l
Route du Condroz 164
Neupré, Belgium
Project approved by delegation. See letter dated 8 May 2025.
CFA 15/MAY/25-m
Wortegemseweg 117
Waregem, Belgium
Project approved by delegation. See letter dated 8 May 2025.